Bethpage, New York
As the prime contractor, Sevenson, who is performing work under six Task Order simultaneously, placed extraction piping, discharge piping, communication conduits, and manholes; performed excavation and disposal of soil; and installed two well vaults and piping from the well vaults to RW6A/B pipeline located on the east side of Hicksville Road. Additionally, Sevenson connected to existing RW6A/6B piping under Hicksville Road; installed multiple electrical vaults; regraded and stabilized the bank north of the vaults and piping; and installed a control conduit from the well vaults to the electrical vault and from the electrical vault to the existing RW6A/B conduit (to the north) and the existing Discharge System conduit to the Boundary Avenue basin (to the south)