Oak Ridge, Tennessee
Sevenson’s SOW as a major subcontractor included removal of an area known as the EU-19 mudlfat as part of a Time Critical Removal Action. Major COCs included radiological contaminants from historical site operations. Work was performed from a floating barge platform in Poplar Creek due to access limitations from the bank. Mechanical dredging of contaminated soils was performed using a CAT 311F excavator. Material was placed into B25 containers for characterization and disposal. This was the first aquatic remediation performed on the Oak Ridge Reservation in decades.