Merrimack, New Hampshire
The New Hampshire Plating Company (NHPC) site is a 13-acre parcel situated among light industries, small businesses and residential properties. The NHPC contained a system of four lagoons and wetland areas, an operations area, and a former production building. The electroplating facility operated between 1962 and 1985 and used metals, chlorinated organic solvents, and cyanide in electroplating operations. Production activities resulted in wastes including metals, VOCs, cyanide and acids. Electroplating operations discharged wastewater containing metals, solvents and cyanide into drainage channels in the building’s concrete floor which flowed into the unlined lagoons. The unlined lagoons occupied wetlands where discharged wastes would overflow into each subsequent lagoon during high discharge events. Discharged waste contaminated surface and subsurface soils and impacted the wetlands.
Scope of work involved the excavation, processing, and in-situ and ex-situ treatment of 100,000 tons of cadmium-contaminated soils using Sevenson’s MAECTITE® chemical treatment process. Sevenson implemented an extensive sampling and analysis program on this project. Daily treatment batches were subject to Toxicity Characteristic Leaching Procedure (TCLP) and Synthetic Precipitation Leaching Procedure (SPLP) testing and selected treatment batches were subject to Multiple Extraction Procedure (MEP) testing. TCLP treatment goals were 1 mg/l for cadmium and 5 mg/l for arsenic, chromium, lead, and nickel. SPLP and MEP treatment goals were 5 ug/l for cadmium, 10 ug/l for arsenic, 15 ug/l for lead, and 100 ug/l for chromium and nickel. Additional SOW included the installation, operation, and maintenance of a 100 GPM wastewater treatment system which processed lagoon water, groundwater, and all water generated from excavation operations prior to discharge to a local POTW.