Midwest

This large industrial site consists of almost 1M SF of operating floor space. Historical operations at the facility included the use of polychlorinated biphenyls (PCBs). As a result of past on-site waste management practices and wastewater discharges to an adjacent creek system, the facility, creek and surrounding properties for several miles became contaminated with PCBs. Land use in the surrounding areas includes zoning for industrial, commercial, and residential uses.

Sevenson has successfully completed several important projects at this site over the last 20 years. The creek sediment and floodplain soils removal phases of work included the installation of water bypass systems; excavation, transportation, and consolidation of 100,000 CY of TSCA-contaminated soil into an on-site 2.5-acre TSCA landfill (landfill cap consisted of three layers of 60-mil HDPE/geotextile fabric; a 3-ft. layer of low-permeability clay; 12-in. layer of crushed stone; and an automated leakage detection system); excavated, transported, and consolidated 200,000 CY of non-TSCA soil into an on-site 40-acre landfill (landfill cap included a clay barrier, 40-mil HDPE liner, drainage geocomposite layer, and cover soil/topsoil); removal of 30,000 CY of PCB-contaminated sediment from a shallow on-site creek; and off-site T&D of 59,000 tons of excavated material. Sevenson constructed, operated, and maintained an on-site WWTP that treated >350M gallons of contaminated water. Sevenson’s final projects at the site included the construction of two 30-ft. deep by 800-ft. long groundwater collection trenches to collect PCB-impacted groundwater.