Pompton Lakes, New Jersey

The former 570-acre Pompton Lakes Works (PLW) facility commenced operations in the early 1900s. Following the cessation of site activities in 1994, the PLW was gradually dismantled and closed. E.I. du Pont de Nemours and Company was subsequently mandated by the NJDEP to execute a remedial investigation at the site to determine the type and scope of contamination. The COCs included mercury in the sediment, and copper, lead, and zinc in the upland soil.

Sevenson’s scope of work included the removal of upland marsh soil; excavation of shallow water sediments; and mechanical and hydraulic dredging of 134,000 CY of mercury-contaminated sediment. Dewatering occurred using desanding through a Total Clean system and six 600 CF filter presses, where Sevenson dropped 1,944 filter cakes and >43,000 CY of filter cakes was produced through the filter presses. Crews completed T&D of all waste; hydraulic placement of a sand layer; and construction and O&M of a 2,500-GPM wastewater treatment system.