
Pittsfield, Massachusetts
Silver Lake is a small urban lake (approximately 26 acres and up to 30 ft. deep) located in downtown Pittsfield, MA. The lake is bordered by a plant and several residential and commercial properties. Historical manufacturing and waste-disposal activities have resulted in the contamination of lake-bottom sediments and lakeshore soil with PCBs.
Sevenson conducted a pilot demonstration project to evaluate the feasibility of installing a 14-inch-thick subaqueous cap in a lake-bottom environment. Successful completion of the pilot study led to the full-scale implementation of this remedy. During full-scale capping operations, Sevenson hydraulically placed 10, 1-inch-thick lifts and two, 2-inch-thick lifts over the 26-acre lake bottom to produce the minimum required 14-inch subaqueous cap. Sevenson designed and built the cap installation system for this project. The material used for hydraulic capping was either a sand/topsoil blend or straight topsoil, with target pre-placement total organic carbon (TOC) in the 1-2% range. The average blend used across the lake was 31% sand and 69% topsoil to achieve the target pre-placement TOC range. Restoration included the installation of trees and shrubs; seeding with conservation and wetland seed mixes; placement of 41 woody debris targets fir fish and wildlife habitats; and installation of nine park benches and a walking path for pedestrians.




