Unimatic operated an aluminum die casting manufacturing process at the site from 1955 to 2001. The process then injected molten aluminum alloy into a closed vessel under high pressure and at a controlled temperature. Prior to the molten alloy injection, the heated mold was coated with a lubricating oil that contained PCBs. Poorly constructed wastewater pipes allowed the contaminated wastewater to leak into the groundwater, soil, and sediments at the property.

Sevenson’s SOW included demolition of the 22,000 SF Unimatic building; installation of 1,055 LF of exterior and interior sheet pile to facilitate the excavation of contaminated soils and to prevent groundwater from entering the excavation area; excavation of 33,715 CY of PCB-contaminated soils, including 15,011 CY of TSCA material; and backfill. Prior to demolition of the building, a demolition permit was acquired, all utilities were disconnected, solar panels were removed, and asbestos abatement was performed. Demolition began at one end of the building and proceeded lengthwise. Sevenson used a PC490 excavator equipped with a bucket or grapple to incrementally pull the roofing material to the floor as the operator worked into the interior of the structure using a staggered approach. A total of 1,013 tons of building debris was transported off-site for disposal as TSCA debris. Perimeter air monitoring was performed during demolition activities and a spotter/sprayer misted water onto the demolition to limit airborne and respirable dust.